Showing posts with label Coffee Mornings. Show all posts
Showing posts with label Coffee Mornings. Show all posts

Thursday, 19 September 2013

TOWN HALL KITCHEN BACK IN ACTION

Saturday 14th September saw the use of the kitchen for the first big event (the British Legion Coffee Morning) since its refurbishment.  The volunteer ladies were able to enjoy the new units, with the range of stainless steel fittings and appliances. 

The kitchen refurbishment has been the Community’s top priority for refurbishment since the original consultation on the fate of the Town Hall back in 2006.  Thanks to funding support from Scottish Hydro Clyde Community Fund and Dumfries and Galloway LEADER Programme, the refurbishment has now been achieved.  Instock, a leading commercial kitchen supply company from Carlisle, together with a local joiner and electrician completed the refit in time for the coffee morning.  The new kitchen provides a much better working environment, and provides a greater range of facilities which can be used for catering during events

Peter Beck-Samuels, a Trust Board member, stated “It is great to see the kitchen refurbished at last, with up to date facilities and work surfaces.”  


The lovely new stainless steel kitchen


The volunteers enjoying using the new facilities

Friday, 2 August 2013

KITCHEN REFURBISHMENT

The kitchen in the Town Hall is to be totally refurbished during the coming month.  The kitchen is extensively used by the Community for all sorts of events; particularly for the Saturday coffee mornings, where more than 200 cups of tea and coffee and home bakes are served by a willing group of volunteers. Much of the equipment is old and does not meet the latest health and safety standards.  It has always been the highest priority for the community for improvement to the Town Hall.  The Trust has been helped enormously by an enthusiastic group of volunteers in developing the plans for the new kitchen.

Thanks to funding support from Scottish Hydro Clyde Community Fund and Dumfries and Galloway LEADER Programme, the refurbishment can now take place.  We are delighted that Instock, a leading commercial kitchen supply company from Carlisle, have been awarded the contract.  They will be using local joiners and electricians during the refit.  There will be a totally replaced floor, hygienic wall panels, new worktops, new cooking facilities including a microwave and an instant water heater; a refrigerator, and replacement crockery, pots and pans and tea and coffee pots.

The new kitchen will provide up to date facilities in the Hall, and will provide enhanced cooking facilities which will allow the Trust to offer more extensive opportunities than have been possible previously.


Peter Beck-Samuels, Chairman of the Trust, stated “We are delighted after a number of years that we can now proceed with the refurbishment of the kitchen, and meet the community’s top priority. It will enhance the facilities, and further improve the use of the Hall, especially with its external face-lift as well”.  One of the volunteers who helped with the planning stated “We are looking forward to using the new kitchen, which is well overdue”.

Sunday, 25 November 2012

What Are The Plans For Moffat Town Hall

Looking in awe at the first posting on this blog, it occurred to me that this was all well and good, but what actually are they doing with £600k.
 
Well, you get surprisingly little for your money, especially when you are having to follow very specific requirements to repair a architecturally significant roof that is leaking like a sieve but here you go!
 
This will provide the money to repair and restore the outside of the Hall. The roof will be re-slated and re-leaded; any other structural repairs to the roof will be undertaken; structural cracks in the foundations will be repaired; the masonry and windows will be renovated, guttering replaced; the supporting beam over the stage will be rectified, bringing the stage back into use; the frontage of the Hall will be renewed, including removing the small wall to make access easier. The whole will result in a building with a long life span, wind and water tight.

The exterior of the Hall will look newly refurbished rather than ‘tired and neglected’. The front will be resurfaced and be open to the pavement.
 
The whole project will take approximately 10 months, but at no stage will the Hall be closed, though for set periods parts of the Hall nearest to the Stage and sections of the front canopy will be closed off for safety reasons.
 
The Main Hall Facing The Stage

Completely separate from this will be a project to refurb the kitchen that is key to many events-not least the world famous Moffat Saturday Coffee Mornings.
 
Martin-a Trustee