REACHING NEW HEIGHTS WITH THE TOWN HALL - PRESS RELEASE: 210513

Repairs to Moffat Town Hall are progressing rapidly, and on time.  The latest changes have seen the installation of the new roof lights to the library:


and the new beam put in above the stage inside the Hall.


In addition the old and peeling paint is being removed and is revealing the sandstone underneath.

Little can be seen of the Hall at the moment, but it is 'business as usual',


The Trust is grateful for the patience and understanding being shown by users and staff of the Hall, recognising the improvements that are taking place.

Peter Beck-Samuels, Chair of the Trust said "We are really pleased with the progress taking place.  It is exciting to see the old building being brought back to a good state of repair.  There have been no major problems detected as we get into the details of the work, and Ashleighs have ensured that the Hall remains in use as far as possible."

The next phase includes re-plastering of the library roof.  This will mean closure of the library for the period 6th and 7th June to enable the work to take place with minimum disruption.

Signed,
Dr. Peter Beck-Samuels, Chairman
01683 221 456
peter@peterbeck-samuels.orangehome.co.uk


VOLUNTEER OPPORTUNITY - 1st COME, 1st TO HELP on Tuesday 4th June 2013

As part of the redevelopment works, Moffat Library has to close whilst work takes place on the roof over that location.

We are looking for 4 volunteers to move books out of the library to a safe location for this period.  Those of you who would like to help with this important task towards the regeneration on Tuesday at the Library from 12.30 p.m. please phone Peter Beck-Samuels on 01683 221 456 or email peter@peterbeck-sanuels.orangehome.co.uk.

Monday, 6 May 2013

ROOF WORKS - Clearer Photographs

Further to the photograph previously uploaded, here's 2 clearer photographs showing the ongoing works to the roof, particularly the parts above the Library and the Corridor.  (Taken before the additional scaffolding/cladding was put in place!)


Friday, 26 April 2013

ROOF WORKS

I mentioned in yesterday's blog that I had noticed work taking place on part of the Town Hall roof.  Here's a photograph:


If you look to the rear of the building you can see a straight line piece of tarpaulin and then a pitched roof with tarpaulin.  Under the straight line is the long corridor off of which are the toilets.  The pitched room is the library.  Both these areas suffered additional damage during the 2012/13 winter gales.  Not there when I actually clicked for the photo to take, but there was a Southwest Roofing workman going up and down the ladder working on the pitched roof yesterday afternoon.

It's unfortunate that it's not possible to tell from the photo, but it was a very bright and sunny blue-sky afternoon with fluffy white clouds!